Last updated: 18 Nov 2026 | 101 Views |
Quick answer: Underground cabling has 3 main parts: the duct line (Duct Bank), cable pull points (Handhole) and spacer combs for HDPE pipes. Choose the cover by what passes over it, choose the number of ways by the cable direction, and confirm the design with the project engineer before ordering.
Handhole is a cable pull point for pulling, jointing and later inspecting cables. It is different from a drainage manhole, which collects and drains water.
| Model | Size (cm) | Cover | Load (per drawing) |
|---|---|---|---|
| Handhole with cast-iron cover, 2-way / 4-way | 60×60×73.5 | Cast iron with frame | Up to 25 tons |
| Handhole with concrete cover, 2-way / 4-way | 60×60×100 | Reinforced concrete with frame | Up to 25 tons |
Other sizes or special numbers of duct openings can be made to order — please ask our sales team.
Yes. Choose the cover by what passes over it, and confirm the design with the project engineer before ordering.
Contact: 092-224-6640, 085-123-8961, 081-341-1610, 085-123-7254, 086-983-8709, 061-401-2720, 090-090-4926 · LINE @ccp-concrete